|
|
Manufacturing of three
metallic footbridges, which roadways are composed of 2 main girders
in HEA profiles crossed on supporting crosspieced tubular
quadripodal posts, including banisters and lifts.
Technical sheet:
Martigues and Istres footbridges: one
14.70 metres span. Port-de-Bouc: one 12.89 metres span plus one 8.39
metres span. Total weight: 143.5 tons.
|
|
Building of a
pedestrian footbridge composed of one section on three 32 metres
supports, of one section on two 15 metres supports, of one belvedere,
of 2 lifts shafts, of 2 stairs, and of one metallic tower.
Fiche technique:
Length: 54 metres.
Global weight: about 70 tons.
|
 |